ATLANTIC YARDS CONSTRUCTION UPDATE
Weeks beginning July 16, 2007 and July 23, 2007
 

In an effort to keep the Atlantic Yards Community aware of upcoming construction activities, ESD and Forest City Ratner are providing the following outline of anticipated upcoming construction activities.

Please note: the scope and nature of activities are subject to change based upon field conditions. 
  

Long Island Rail Road/Vanderbilt Yard Work

  • Continue drilling Support of Excavation (SOE) mid-block piles.
  • Test pile for temporary train trestle foundation piles.
  • SOE piles at northeast & southeast portion of block 1121 contingent on DOB and DOT permits.
  • Test pits at Pacific Street piles on block 1121 to confirm location of existing street utilities proximate to layout of piles.
  • Test pits at existing wall separating lots 42 and 47 on block 1121.

 

Abatement and Demolition Work

All work described below will comply with the additional oversight and protocols by the Department of Buildings (DOB) that were established on April 30th.

  • All of the protective measures requested by the DOB have been installed.
  • The double-shift abatement and emergency demolition work on the parapets at 800 Pacific Street will continue for the next five-six weeks.
  • Demolition of 546 Vanderbilt Avenue (block 1129, lot 54) will commence and is anticipated to be underway for the next two months.
  • Demolition of 622 Atlantic Avenue (block 1119, lot 1) will be underway and will likely be completed within this two week period.
  • Abatement at 175 Flatbush Avenue (block 1118, lot 6) and 177 Flatbush Avenue (block 1118, lot 5) will be underway and completed within this two week period.

 

 Utility Work

A shed will be constructed over a transit manhole in the sidewalk on Flatbush Avenue between Atlantic Avenue and Pacific Street to prepare the manhole for cable insulation, abatement and reconstruction as part of the private utility/transit relocation work required to accommodate new sewer infrastructure. This work will continue for approximately 4 weeks.

 

 

 

 

 